home
***
CD-ROM
|
disk
|
FTP
|
other
***
search
/
Space & Astronomy
/
Space and Astronomy (October 1993).iso
/
mac
/
TEXT
/
DAILY_2
/
930512.DFC
< prev
next >
Wrap
Text File
|
1993-05-24
|
4KB
|
102 lines
"930512.DFC" (3363 bytes) was created on 05-12-93
12-May-93 Daily File Collection
These files were added or updated between 11-May-93 at 21:00:00 {Central}
and 12-May-93 at 21:00:15.
=--=--=START=--=--= NASA Spacelink File Name:930512.REL
5/12/93: STS-57 PREFLIGHT SCHEDULED, STS-55 POSTFLIGHT RESCHEDULED
Ed Campion
Headquarters, Washington, D.C. May 12, 1993
Barbara Schwartz
Johnson Space Center, Houston
NOTICE TO EDITORS: N93-26
The STS-57 Space Shuttle mission preflight briefings will be held May
18 at the Johnson Space Center, Houston, building 2, room 135.
The STS-55 Spacelab D-2 postflight crew press conference, originally
announced for May 18, has been rescheduled for May 19 at 11 a.m. EDT.
The STS-57 mission will include the retrieval of the European
Retrievable Carrier, the first flight of SPACEHAB (a laboratory for commercial
experiments), the Super Fluid Helium On-Orbit Transfer experiment and a
spacewalk.
All briefings will be carried on NASA Select television with two-way
audio for questions from participating NASA locations. NASA Select programming
is carried on SATCOM F2R, transponder 13, located at 72 degrees west longitude.
STS-57 PREFLIGHT BRIEFINGS
May 18, 1993
Time EDT Briefing Location
9:30 a.m. Mission Overview JSC
Al Pennington, Lead Flight Director
10:30 EURECA (European Retrievable Carrier) KSC
Alan Dover, EURECA Manager, KSC
Dr. Rasaello Carli, EURECA Instrument Engineer
11:10 SPACEHAB-1 KSC
Dan Bland, Manager, Commercial Middeck
Augmentation Module Project Office
12:00 SHOOT (Super Fluid Helium On-Orbit Transfer) GSFC
Neal Barthelme, Mission Manager
Dr. Michael DiPirro, Principal Investigator
2:30 p.m. EVA (Extravehicular Activity or "Spacewalk") JSC
Richard Fullerton, EVA/Crew Systems Section
4:00 STS-57 Crew JSC
-end-
Source:NASA Spacelink Modem:205-895-0028 Internet:192.149.89.61
=--=--=-END-=--=--=
=--=--=START=--=--= NASA Spacelink File Name:3_6_2.TXT
NOTE: This file is too large {28324 bytes} for inclusion in this collection.
The first line of the file:
SHUTTLE PAYLOAD FLIGHT ASSIGNMENTS
Source:NASA Spacelink Modem:205-895-0028 Internet:192.149.89.61
=--=--=-END-=--=--=
=--=--=START=--=--= NASA Spacelink File Name:6_12_7.TXT
Mir element set #66 (12-May-93)
Mir
1 16609U 86 17 A 93132.54131943 .00015407 00000-0 20131-3 0 664
2 16609 51.6211 38.5140 0000367 214.8741 152.0140 15.58851884413570
Satellite: Mir
Catalog number: 16609
Epoch time: 93132.54131943
Element set: 66
Inclination: 51.6211 deg
RA of node: 38.5140 deg Semi-major axis: 3655.0071 n.mi.
Eccentricity: 0.0000367 Apogee altitude: 211.2071 n.mi.
Arg of perigee: 214.8741 deg Perigee altitude: 210.9388 n.mi.
Mean anomaly: 152.0140 deg Altitude decay: 0.0241 n.mi./day
Mean motion: 15.58851884 rev/day Apsidal rotation: 3.7464 deg/day
Decay rate: 1.5407E-04 rev/day~2 Nodal regression: -5.0165 deg/day
Epoch rev: 41357 Nodal period: 92.3141 min
G.L.CARMAN
Source:NASA Spacelink Modem:205-895-0028 Internet:192.149.89.61
=--=--=-END-=--=--=
=--=END OF COLLECTION---COLLECTED 3 FILES---COMPLETED 21:06:50=--=